Hi!!
Wow I can’t believe it’s been almost a month since my last post.
I apologize for such a long absence, it’s just been so crazy over here.
We (mainly the husband) have been working on the bathroom every night and weekend to get it done before the baby shower on July 1st! yikes! We have one week left and still have a good amount to get finished.
paint bathroom & hallway walls and trim
seal tile and grout
install shower trim
install toilet
install pedestal sink
install faucet
hang mirror
install vanity and chandelier light
finish electrical (fan, switches etc)
install door hardware
install shelves
install towel and tissue fixtures
Woo!! Did I forget anything?
Anyway here are some progress shots so you can see what we’ve been up to.
We decided to open up the wall to install a pocket door, which has made a huge difference for the space.
Here it is all framed up and installed. I love it!
So here we got the tub in, insulation in, and are starting to drywall.
The drywall going up has made a huge difference, now we could really visualize it!
Day 2 of tile install! (I’m saving the finished tile for the reveal)
And now today has been all about paint, Left to Right: Wickham Gray, Horizon and Moonshine all Benjamin Moore colors. We actually already primed the walls, tinted to Horizon so that’s why you can barely see it.
We are painting tonight so I’ll surprise you with the color I chose ; )
Oh and by the way I’m 30 weeks as of yesterday! Yeee!!
Here’s a belly shot from week 29
Hope you all enjoy your weekend! Wish us luck on wrapping this bathroom up! My poor husband will be busy all weekend ; )